Home > Benchwork, DCC > Phase 1 Complete

Phase 1 Complete

December 22nd, 2009

Tonight I finished up what you could call Phase 1.  That is, all of the under-layout DCC bus wiring is installed, and the wire panel installed, wired to the busses, and powered.

The next step will be to work on getting the benchwork top installed and the center divider backdrop.

Benchwork, DCC

  1. December 23rd, 2009 at 00:14 | #1

    That’s a beauty install Shaun. I’m a structured wiring guy by profession and really appreciate a top notch wiring job.

  2. December 23rd, 2009 at 08:12 | #2

    Man Shaun, with this post and the other one showing the wiring, you do a great job stringing/organizing all the wires. You’ll have to do a post on your methods.

  3. December 23rd, 2009 at 14:18 | #3

    Shaun,
    Um, ok, you got me. What’s your day rate for wiring? Any chance of atutorial next time I’m in Baton Rouge?

    That’s seriously heavy duty stuff – way more then I thought I needed for DCC on a shelf layout . . . .

  1. No trackbacks yet.