Home > Previous Layout > Terrain and Scenery Re-Work

Terrain and Scenery Re-Work

April 19th, 2009

In the midst of prepping to redo my terrain covering with plaster cloth, I decided I wanted to first redo some of the terrain base and fascia. This mainly included making the hill at the end of the lower level flush with the fascia (not just a hill that looks like a big bump), building up a hill at the first corner, and then making the fascia flow more with the terrain, especially at the river banks.

So first I yanked off the existing fascia.

Then I cut new pieces of masonite there were 7″ (short section) and 6″ tall (river section), and installed them in place.  I also added a piece to the edge of the layout to complete the fascia covering here.

I then rebuilt the hills as I wanted.

And then trimmed the fascia with a Dewalt Cut-out drill to “flow” with the terrain.

A huge improvement to what it looked like before.

Shaun Previous Layout

  1. Tom
    April 19th, 2009 at 20:35 | #1

    I agree, that looks a ton better. Nice.

  2. nicholas krystynak
    July 9th, 2009 at 19:12 | #2

    I like your train layout and the mountain scenery work is very good on the train layout. so i’ve been watching video on your youtube page and I’ve watch the layout video.Thanks for bulding the train layout for the youtubers.

  1. No trackbacks yet.