Commence Operation: Save Helix
Tearing my hair out trying to figure out out to “bridge the gap” between my two levels, I decided to give the helix one more shot.
This evening I managed to break up the helix and save all of the curved wood cutouts. So this will save me a lotta time/money. Just need to remove all the little wedge pieces I added to try and save the original build.

Also got the track off too, just need to clean off some off the hot glue.

I plan on rebuilding using eyehooks attached to the cutouts, and some nuts on 20″ steel rods. This will allow me to adjust levels on the fly and get a real smooth ride up. Like this:
Helix
*Hopefully* this will give me a workable helix.
Shaun Previous Layout
Taco Bell finally got their signs delivered this weekend for their Elmwood location (and got a “tar” roof coating too).

Dixie Yard got their Engine house building up. They still need to lay down some concrete inside on the service tracks, and install a service platform outside.

Pizza Hut broke ground on a new location in Elmwood this past week too. I guess a little friendly competition with the Dominoes that’s going to be under construction soon down the block.

Luckily the messed up name will be facing the backdrop. 
A new corner gas station is rumored to be coming to Elmwood and Marathon’s South City Refinery has two large storage tanks on order from Kibri, enroute from Europe.
Shaun Previous Layout