Under construction for 1 Year, 9 Months and 4 days.

Manual Schmanual

May 23rd, 2007 @ 7:13 AM CT

haretortoisecombo.jpgAll that stuff I said about using manual turnouts… forget about it. :)

I decided since this is my “permanent” layout, I’m gonna go all out on it still. I know all mainline turnouts and sidings will be tortoise controlled with either a Hare or Wabbit DCC module, depending on location.

Yards and industry tracks I’m not sure yet. I’m thinking manual, but not sure if I would want to use the Hump Yard ones, the oversized looking Caboose Industries ones, possible some manual Blue Point controls, or just make ‘em all remote operated as well.

Posted in General |

Leave a Comment

Please note: Comment moderation is enabled and may delay your comment. There is no need to resubmit your comment.