Staging “Trays”
May 8th, 2007 @ 11:37 AM CT
Another idea popped into my head while looking at the layout and trying to figure out how to turn trays and simulate thru-trains, etc…
I first thought about using a staging cart. Basically a little I could roll out from under the layout, raise up to level height and roll trains on and off. But figuring out how to raise the tracks that high for level 1 and 2 seemed like a pain. Then the idea of a caddy/tray hit me.
So here’s my thoughts. On level 1 I would remove the yard ladder totally. It’s place I would put 2 arrival/departure tracks simulating the tail end of the yard the train is approaching. Under each track (2 yards and 1 main) I would cut of a 1″ deep channel into the blue foam that will be on top the 1/4″ plywood (or 1/2″ haven’t decided yet). Length would be about 40-50″, width maybe 1″ or 2″. I’ll have to tinker with real stuff to determine that. In each channel I would then place a piece of 1″x?”plywood with track attached.
I now have a removable “staging tray” for trains. This would allow to me turn trains around such as an Amtrak train, and simulate the train entering the yard and leaving layout without having to use up real estate for another yard. One of these is enough for me and the budget, heh.
I would do the same for level 2, just had a straight section behind the refinery for the tray piece to remove trains that are continuing on past the refinery to whereever they are headed.
I really like this idea and it’ll be a snap to implement. Here’s a really crappy drawing I made on a post-it note
Posted in Benchwork, Track plan |
